×

Loading...
Ad by
  • 推荐 OXIO 加拿大高速网络,最低月费仅$40. 使用推荐码 RCR37MB 可获得一个月的免费服务
Ad by
  • 推荐 OXIO 加拿大高速网络,最低月费仅$40. 使用推荐码 RCR37MB 可获得一个月的免费服务

@

如果采用先钉好木架子,再就位的方法。就要留0.5\",否则,一点空隙也没有,怎样才能就位?0.5\" 并不意味要“float” . 木架子是要固定在顶梁上的。

When you have assembled the wall, tip it into place, and align it with the layout marks on the floor. Use wood shingles to shim between the top plate and the underside of each joist. Make sure the wall is plumb; then nail through the top plate and into the joists using two 16d nails at each location.
More details see:
http://books.google.ca/books?id=v_ZW_peCTLkC&pg=PA102&lpg=PA102&dq=%22tip+the+wall%22&source=web&ots=GrCgiKyQkD&sig=o2xz6t2vJqRUkMIvCVPdA_EDd-s&hl=en&sa=X&oi=book_result&resnum=5&ct=result#PPA103,M1
Sign in and Reply Report

Replies, comments and Discussions:

  • 枫下家园 / 美丽家居 / 【边学边干】DIY装修Basement记录,(二)搬运
    • 加油!看那木条叠那么整齐,就知道你这工程会做得很好。我一个朋友也有你那个专劲,最后做好后质量比外面专业的强。在边上悄悄学着,以后自己干时心里有底。
    • "Dry wall的背面划开,正面的纸不破坏"确实是个好办法,但还是会有后遗症。我在考虑把地下室的门,包括门框整个拆下来,工程完后在装上。只是这个位置能否进Dry wall还是有点拿不准。
      • Dry wall 长96",门加上框的对角线也只有88",应该是下不去的,而且搬的时候很麻烦,一块Dry wall有45磅呢,我都得歇两次才能搬下去。
    • why don't you buy 2x4x92? same price better quanlity
      • 我买的大部分是2X4X92-5/8,只有几根是2X4X8的,用在比较长的墙上。
        • oh, I was wrong, I think you bought 2x3x8
          • 因为墙上已有一部分insulation,所以我想用2X4作底条、2X3作立条,给原有的insulation空出1"的空间。
    • I saw my water tank looks like the same as yours, can you tell me how much you pay for the rental if it is rented. Thanks
      • 好象是$20.02吧
    • 关注中!
    • 牛!严重关注
    • 趁还没开始干,先向大侠们请教两个问题: 1.木架子是不是要做成所谓float的,就是要比顶梁到地面的长度短0.5"? 2.木架子固定到顶梁上时,是不是螺丝不能拧死,还是要留大约0.5"?
      • 哪听来得?
        • http://www.finishabasement.com/construction/framing_walls.htm
          • 哦,我到没注意这些, 还请高手回答.
            the downside of cutting drywall is that you have to have a wood support at cutting line when you install on the wall. you 'd better make consideration before start your job.
      • 是大侠们都忙着过节呢,还是我的问题太愚蠢?
        • I am planning to do the same job as you are doing. I consulted an expert about this question, the answer I got is “no”. You needn’t leave the half inch gap.
          I viewed the website you posted as well and noticed the half inch gap is used for method 1 only. We most likely will use method 2.
          • 多谢回复
      • 钉好木架子再扶正装上是专业做法,优点是快,缺点是难保证装好后所有木条在同一平面,又要留大于1/4“的空隙,框架不如先装上下横条,再上竖条的牢靠。
      • 如果采用先钉好木架子,再就位的方法。就要留0.5\",否则,一点空隙也没有,怎样才能就位?0.5\" 并不意味要“float” . 木架子是要固定在顶梁上的。
        When you have assembled the wall, tip it into place, and align it with the layout marks on the floor. Use wood shingles to shim between the top plate and the underside of each joist. Make sure the wall is plumb; then nail through the top plate and into the joists using two 16d nails at each location.
        More details see:
        http://books.google.ca/books?id=v_ZW_peCTLkC&pg=PA102&lpg=PA102&dq=%22tip+the+wall%22&source=web&ots=GrCgiKyQkD&sig=o2xz6t2vJqRUkMIvCVPdA_EDd-s&hl=en&sa=X&oi=book_result&resnum=5&ct=result#PPA103,M1
        • 多谢你推荐的书,很有帮助。
    • 灰板怎么都裁成半张啊,你批灰的工作量就大了好多。
      • 特别是吊顶,头对头接缝(边对边好处理)多了简直是噩梦!白天反光一照,面目全非。我为此返工了3次,还在努力中。见楼主切开所有的板,为他捏把汗。。。
        • 没关系,你如果批灰技术不高,建议你做麻顶(死打果stucco ceiling),这样就可以掩盖你的不足之处。